Buyers › Condos

Buying a condo here,
after the new rules

Florida rewrote its condominium laws after the Champlain Towers South collapse in 2021, and the changes reached every elevator building in the state: mandatory engineering inspections, mandatory structural reserve studies, and the end of the vote that used to make reserves optional. None of that makes a condo a bad buy in Punta Gorda; it makes the building’s paperwork the most important thing you will read before you sign.

Every statute, deadline and threshold on this page verified against the Florida Legislature, Fannie Mae and primary reporting in November 2026. Condo law has changed every year since 2022; the dates here tell you how fresh the answers are.

What Changed

Why condo buying is different now

After Surfside, Florida passed a structural-safety law in a 2022 special session and has refined it in nearly every session since, most recently in 2025. The result is two instruments that now sit at the center of every condo purchase in a building of three habitable stories or more: the milestone inspection, an engineer’s look at the structure itself, and the structural integrity reserve study (SIRS), a priced plan for keeping it standing.

The financial change is just as large: associations can no longer vote to skip funding reserves for structural items. Buildings that spent decades deferring the roof, the waterproofing and the concrete are now pricing that honestly, which is why condo fees and special assessments across Florida have jumped since 2022, and why two similar buildings can carry very different monthly numbers.

The 2026 Legislature adjourned in March without passing further condominium changes, so the rules below are the current ones. They are also, for a careful buyer, good news: for the first time, Florida law entitles you to see the building’s engineering and its honest books before you are committed.

The Two Instruments

The inspection, and the money study

Both apply to buildings of three habitable stories or more. One examines the concrete; the other prices what the concrete will cost. As a buyer you are entitled to see the results of both, and the absence of either is information too.

The engineering · F.S. 553.899

Milestone inspection

3+
habitable stories
30
years old, then every 10
25
if the local building authority requires it

A licensed architect or engineer examines the building’s structure. Phase one is a visual assessment of the major structural components; if it finds no substantial structural deterioration, the building is done for ten years. Phase two, triggered only by findings, can involve testing, and ends in a repair plan.

The first inspection is due by December 31 of the year the building turns 30, counted from its certificate of occupancy. A local building authority may require it at 25 years instead, based on local conditions such as proximity to salt water, so the operative date is a local question, and one Bob checks per building. The catch-up deadlines for older buildings fell at the end of 2024 and 2025, so every building here that is 30 or older should have a completed inspection by now, or a documented reason it does not.

Owners must receive the inspector’s summary within 45 days of the association getting it, and the association must post it. Translation: this document exists, and a seller or association that cannot produce it is telling you something.

The money · F.S. 718.112

Structural integrity reserve study

10
years, at most, between studies
2025
year-end deadline for the first one
$25k
threshold for included items, inflation-adjusted

The SIRS prices the remaining life and replacement cost of the items that keep a building standing, and sets the reserve schedule to fund them. By law it must cover at least:

  • Roof
  • Structure: load-bearing walls and primary structural members and systems
  • Fireproofing and fire protection systems
  • Plumbing
  • Electrical systems
  • Waterproofing and exterior painting
  • Windows and exterior doors
  • Any other item over $25,000 whose failure would affect the items above

Most established associations had to complete their first SIRS by December 31, 2025 (a deadline the Legislature already extended once), so by now a qualifying building either has one or is late. The study is only half the story; whether the budget actually funds it is the other half, and that is the next section.

Follow The Money

The vote that no longer exists

For decades, Florida condo budgets had a ritual: the reserve study said what the building needed, and the owners voted to waive funding it, keeping fees low and pushing the bill to whoever owned the units when the roof finally went. That vote is gone for structural items. For budgets adopted since the end of 2024, an association required to have a SIRS may not provide no reserves, or less than the study calls for, for those items.

That single change explains most of what buyers notice in 2026: fees that jumped, special assessments in buildings that deferred for years, and, the part that gets missed, a growing set of buildings whose finances are now genuinely in order. The law left associations a few ways to manage the transition:

Borrowing is allowed

Structural reserves may be funded by regular assessments, special assessments, a line of credit or a loan; the latter three need a majority vote of the owners. A building financing its repairs is complying, not cheating; the question is what the debt service does to the fee.

A narrow, temporary pause

Through budgets adopted by the end of 2028, a building that completed its milestone inspection within the previous two calendar years may vote to pause or reduce reserve contributions for at most two consecutive budgets, only to pay for the inspection’s recommended repairs, and a new SIRS is required before contributions resume.

What it means when you shop

A high fee may mark the healthiest building on the street: one that is done paying for its past. A low fee is a question, not a prize: ask what is not being funded, what was recently borrowed, and what the SIRS says should be happening.

Before You Go Firm

The documents the law puts in your hands

On a resale, Florida Statute 718.503 entitles you, at the seller’s expense, to a current copy of all of the following. Bob requests the full set the moment a condo contract is in play, because the review clock below only starts once you have them.

Declaration of condominium

The constitution of the building: what you own, what the association owns, what you may and may not do with the unit, including rental and pet rules that live here or in the bylaws.

Articles of incorporation, bylaws and rules

How the association is run, how the board is elected, and the house rules you are agreeing to live under.

Annual financial statement and annual budget

Where the fee actually goes, line by line, and whether reserves are being funded or just mentioned.

Milestone inspection summary (if applicable)

The inspector’s own summary of what the engineering look at the building found. If the building is 30 or older and there is no summary, ask why in writing.

The most recent structural integrity reserve study

Or a written statement that none has been completed, which is itself an answer, and not a comforting one in a building that was required to have one by the end of 2025.

Turnover inspection report

For associations turned over by the developer on or after July 1, 2023, the condition report from the hand-off.

Frequently Asked Questions & Answers sheet

A standardized summary: voting rights, fees, rental restrictions, pending lawsuits. Read it first; it is short.

Governance form

The state’s plain-language overview of condominium living and your rights under chapter 718.

You get 7 days to walk away, not 3, whatever older websites say

A resale condo contract is voidable by the buyer for 7 days, not counting Saturdays, Sundays and legal holidays, measured from signing and from receiving the documents above, so a seller who is slow producing them is extending your window, not shrinking it. The right cannot be waived by any contract language, and it ends at closing. Buying new from a developer, the period is 15 days.

This was a 3-day window until July 1, 2025, when the Legislature more than doubled it, a direct acknowledgment of how much reading now matters. Plenty of sites and old contract forms still say three days. Use all seven: that is the time to read the SIRS against the budget, order the estoppel, and have your lender run the building. Bob treats the week as a project plan, not a formality.

The Money Questions

Six numbers to understand before you write the offer

The fee, and what is inside it

Two condos with the same price and wildly different fees are not necessarily mispriced; the numbers may contain different things. Many Southwest Florida condo fees carry the building’s insurance, often water, sewer, trash and basic cable, the grounds, the pool, the manager, and the reserve contributions. Compare buildings by what the fee funds, not by the raw number. A higher fee that is honestly funding reserves can be far cheaper over five years than a low fee followed by a special assessment.

Who insures what: the HO-6 line

Florida law draws the boundary. The association’s master policy covers the condominium property as originally installed; it specifically excludes your personal property plus floor, wall and ceiling coverings, electrical fixtures, appliances, water heaters, water filters, built-in cabinets and countertops, and window treatments. Those are yours to insure, which is what an HO-6 unit-owner policy is for. Add loss assessment coverage, which helps when the association levies owners after a loss. Flood is a separate policy on both sides of that line; see the flood guide.

Special assessments, and the estoppel

A special assessment is a one-time levy on top of the fee, and post-Surfside they are how many buildings are paying for decades of deferred structure. The binding answer to “what is owed on this unit” is the estoppel certificate, which the association must deliver within 10 business days: an itemized statement of assessments, special assessments and other sums owed, plus amounts that will come due during its effective period, transfer fees, open violations, and approval requirements. Pair it with a year of board minutes: the estoppel states what has been levied; the minutes tell you what is being discussed.

The reserve funding level

Read the SIRS next to the budget and ask one question: is the association funding what its own study says the building needs? Structural reserves can no longer be voted away, but buildings arrive at compliance from very different starting points: some have funded reserves for years, some are catching up with loans or assessments, and the difference is your future fee. Reserves for structural items may be pooled only with other structural items, so the structural money is visible if you look.

Milestone and SIRS status

Has the building completed its milestone inspection? Did phase one close it out, or did findings push it to phase two? Are recommended repairs scheduled, funded, and by whom? Every deadline for buildings 30 and older has now passed, so “we have not gotten to it” is no longer a neutral answer; it is either a documented extension or a compliance problem that becomes yours at closing.

Taxes on a condo

Condo units are assessed and taxed like any other Florida home, and like any other home, the seller’s current tax bill is not a forecast of yours, because the assessment resets to market value after a sale. If it will not be your permanent residence, the 10% non-homestead cap applies instead of homestead. The property tax guide walks through all of it with current local rates.

The financing reality nobody volunteers: the building gets underwritten too

Since Surfside, Fannie Mae and Freddie Mac scrutinize the building before they will back a loan in it: its repairs, reserves, insurance and assessments. A building that fails is “non-warrantable,” and in Fannie Mae’s lender systems it can carry an “Unavailable” status that makes loans there ineligible outright. This is not rare or theoretical: reporting in spring 2025 put roughly 1,400 Florida condo buildings in that position, and the list is lender-facing; there is no public version to check yourself.

It tightened further in 2026. For loan applications dated on or after August 3, 2026, the agencies retired their light-touch review paths: nearly every condo loan now requires a full project review or a narrow waiver, and from January 2027 the reserve line in a building’s budget is expected to reach 15% of budgeted income for applicable loans, up from 10%.

What to do with that: if you are financing, have a lender run the specific building before you write, or in the first days of your window, and if the building is non-warrantable, the plan becomes a portfolio or other non-agency loan, a larger down payment, or cash. Some agents soft-pedal all of this to keep a deal moving; Bob raises it on day one, because a cash-flexible plan is the difference between an option and a dead end in some buildings, and because a thin pool of future financed buyers is a fact that belongs in your offer price.

Local Texture

Where the condos are in Bob’s market

Charlotte County’s condo stock is nothing like Miami’s towers. It clusters in a handful of places, mostly low- and mid-rise, much of it on deep water. The post-Surfside rules apply at three habitable stories, which catches many of the waterfront buildings here and skips the two-story villas entirely.

Punta Gorda Isles

Several well-regarded buildings sit along the widest water in the neighborhood (the deep basins and harbor frontage), many with deeded or assigned dockage, elevators and secure parking. Buildings vary widely in age, reserves, and milestone status, and knowing which ones are well run is Bob’s home turf, literally: he lives in PGI and his office sits at its entrance.

Explore the neighborhood

Burnt Store Marina

Condos and high-rises from the late 1970s to the present around the largest deep-water marina on this coast, organized as 47 sub-associations under a master association, so every purchase has two budgets, two sets of documents, and a seawall history worth reading about. Also note: it is Lee County, not Charlotte.

Explore the neighborhood

Downtown Punta Gorda & the harborfront

Low- and mid-rise buildings within walking distance of the restaurants, the Harborwalk and the weekend markets, plus condos along Charlotte Harbor itself. The draw is the lock-and-leave life in a real downtown; the diligence is the same: documents first.

Explore the neighborhood

How Bob Works A Condo Purchase

Documents first, feelings second

He reads the building before you commit to it

Budget, SIRS, milestone summary and a year of board minutes, requested with the showing when possible, and read before you are emotionally invested. Ten minutes with a budget tells him whether the fee is honest; the minutes tell him what the board is worried about that has not reached a vote yet.

He gets the money questions asked early

The estoppel request goes in at contract rather than the week of closing, the special-assessment allocation gets decided in the offer itself, and if you are financing, a lender runs the building through project review while you can still walk for free. Surprises in a condo deal are almost always just questions that got asked late.

He asks for inspection status, building by building

Bob works these buildings year-round (PGI’s basin condos are his own neighborhood), and he asks associations directly for milestone status, extension paperwork and the repair plan rather than relying on a listing’s silence. He does not publish a list, because status changes as buildings complete work; he asks again, every time, for the building you actually want.

Buying from outside the US? Condos are the most common first purchase for overseas buyers here; lock-and-leave suits a snowbird season. The rules on this page apply to you unchanged, and a second set of questions (financing from abroad, taxes, how to hold title) comes with the passport: the International Buyers’ Guide covers them.

Questions

Condo buying, answered

How long do I have to cancel after signing a condo contract?

Buying a resale from a private owner, the contract is voidable for 7 days (not counting Saturdays, Sundays and legal holidays) running from the date you sign and receive the condominium documents, whichever is later. Buying a brand-new unit from a developer, the period is 15 days. The right cannot be waived, and it ends at closing. Worth knowing: this was 3 days until July 1, 2025, and plenty of websites and old form contracts still say 3. Florida extended it precisely because the documents got longer and more important.

What exactly is a SIRS?

A structural integrity reserve study: a study, with a licensed engineer or architect involved in the visual inspection, that prices the remaining useful life and replacement cost of the building’s structural items (roof, structure, fireproofing and fire protection, plumbing, electrical, waterproofing and exterior painting, windows and exterior doors, plus anything over $25,000 whose failure would affect those) and sets the reserve funding schedule to match. Buildings of three habitable stories or more must have one at least every 10 years, and the first one was due by the end of 2025 for most established associations. As a buyer you are entitled to the most recent SIRS, or a written statement that none exists.

Can owners still vote to waive reserves?

Not for the structural items. For budgets adopted since the end of 2024, an association required to have a SIRS may not provide no reserves, or less than the study requires, for those items. What remains: the money can be raised by regular assessments, special assessments, a line of credit or a loan (the latter three need a majority vote); and a building that completed its milestone inspection within the previous two calendar years can, by majority vote, pause or reduce contributions for up to two consecutive budgets to pay for the recommended repairs, a provision that itself sunsets with budgets adopted after 2028. Reserves for non-structural items can still be waived the old way.

What if the building has not done its milestone inspection?

Ask why, in writing, before you go further. Every statutory deadline for buildings 30 years and older has now passed (the transition dates were the end of 2024 and the end of 2025), so a 30-plus building with no inspection on file is either on a documented extension from the local building department or out of compliance. Either answer matters: an un-inspected building is an unpriced building, your lender’s project review will ask the same question, and the repair bill from a late inspection lands on whoever owns the unit when it comes.

What does “non-warrantable” mean, and why would a condo be on an “unavailable” list?

It means the building, not you, fails Fannie Mae or Freddie Mac project standards, so lenders cannot sell loans in it to the agencies and most conventional mortgages become unavailable there, regardless of your credit. Since Surfside the common triggers are unrepaired structural or safety issues, significant deferred maintenance, inadequate insurance or reserves, and certain special assessments. Fannie Mae tracks this in a lender-facing system; if a project shows “Unavailable” status there, loans in it are ineligible, and as of spring 2025, reporting put roughly 1,400 Florida buildings in that position. A building’s status can improve when it completes repairs and documentation, so the current answer always comes from a lender running the project, not from a rumor.

How do I find out if a building is financeable before I fall in love with it?

Ask a lender to run the project, by name and address, through the agency project review before or at the start of your inspection period, not the week before closing. There is no public list to check yourself; the status lives in lender systems. And since August 3, 2026, the old light-touch “limited review” is gone: nearly every condo loan now gets a full project review, which means the building’s budget, reserves and insurance get examined along with your finances. Bob raises this on day one with condo buyers who are financing, because the answer shapes which buildings are even on the menu.

What if the building I want is not warrantable, is it dead to me?

Not necessarily, but the plan changes. Options include portfolio loans that a bank keeps on its own books, other non-agency programs, a larger down payment, or cash; some buyers close in cash and refinance later if the building’s status improves. Each path costs more or demands more than an agency mortgage, which is why knowing the building’s status early matters: it tells you whether the price should reflect a thinner pool of future buyers, too. That cuts both ways when you eventually sell.

Is the association fee negotiable?

No. The fee is set by the adopted budget and is the same for every owner of comparable units; no seller can discount it and no buyer can negotiate it down. What is negotiable: the purchase price, and who pays a special assessment that has been levied but not yet fully paid. Florida’s standard condominium contract language allocates that between buyer and seller, so decide it in the offer, not at the closing table.

What insurance do I need for the unit itself?

An HO-6 unit-owner policy covering what the master policy legally does not: your personal property, plus floor, wall and ceiling coverings, electrical fixtures, appliances, water heater, water filters, built-in cabinets and countertops, and window treatments (essentially, the unit from the unfinished surfaces in). Add loss assessment coverage for your share of association deductibles after a loss. And remember flood is separate on both levels: the association’s flood policy covers the building, not your contents or improvements; the flood guide covers when and how to buy your own.

Do these rules apply to a two-story villa or townhome?

Mostly no. Milestone inspections and the SIRS apply to buildings three habitable stories or more, so the two-story condo villas common around Punta Gorda are exempt from both, one reason some buyers who want low fees shop under three stories on purpose. The rest of the diligence does not change: budget, reserves, estoppel, minutes, insurance and the 7-day review window all still apply. One wrinkle: some attached homes here are governed by a homeowners association under a different chapter of Florida law rather than a condominium association (different documents, different disclosure rules), and Bob will tell you which one you are looking at before you write.

Bob Helphenstine is a Realtor®, not an attorney, an engineer, an insurance agent or a lender. This page is general education about Florida condominium purchases, verified against the Florida Statutes, Fannie Mae publications and primary reporting in November 2026. It is not legal, engineering, insurance or lending advice, and it is not a statement about any specific building. Condominium law has changed every year since 2022 and will change again; inspection status, reserve funding, association finances and financing eligibility are building-specific and move constantly. Verify everything against the association’s current documents, the current statutes, and your own attorney, inspector, insurance agent and lender before relying on it.